Demolition Framing Roofs Craft Work Hold-Downs Electrical Index

Remodel 2005: Crafts Work

Click on an index image to see it at a larger size.


Fri 07-01: Are they going to break our mirror?

Fri 07-01: Mirror continued

Fri 07-01: Mirror continued

Fri 07-01: Mirror continued

Fri 07-01: Mirror continued

Mon 06-27: Phone and TV wiring by Bill Piquette

Thu 07-21: Downstairs window alarm wiring by Bill

Sun 07-03: HVAC, air duct for new room

Sun 07-03: HVAC, air duct and roof hole

Sun 07-03: HVAC, holes into new room attic for air duct and personnel or fumigation access

Sun 07-03: HVAC port box for new room

Thu 06-23: Recessed lamp

Sun 07-03: Recessed lighting fixture

Fri 09-02: Drywall installation

Fri 09-02: Drywall installation

Mon 09-12: Drywall installer on stilts

Fri 09-16: Drywall finished: dining room #6

Fri 09-16: Drywall finished: breakfast room #7

Fri 09-16: Drywall finished: upstairs #7

Fri 09-16: Drywall finished: upstairs #16

Wed 08-31: Chicken wire on east wall at #11

Wed 08-31: Chicken wire at southeast corner, #16

Fri 09-16: Stucco scratch coat, upper corner at #7

Fri 09-16: Stucco scratch coat, southeast corner #16

Tue 09-20: Leak! Upstairs, south wall #15

Tue 09-20: Leak! South wall exterior showing flow path.

Fri 09-23: Stucco brown coat on upstairs east wall.

Fri 09-23: Detail of flashing where northeast window (#11) meets roof, and mess.

Fri 09-23: Stucco brown coat on upstairs west wall.

Fri 09-23: Stucco brown coat on upstairs west wall.

Fri 09-23: Gutter, under eaves, and old-new joint at east corner of octagon.

Fri 09-23: Stucco brown coat on east wall.

Fri 09-23: Northwest corner (#2) detail under eaves and old-new joint.

Fri 09-23: Stucco on west wall.

Fri 09-23: Northwest corner (#2) old-new joint and door.

Fri 09-23: Stucco brown coat on south wall (upper).

Fri 09-23: Stucco brown coat on south wall (lower). Also notice the original plantings.

Fri 09-23: Stucco on east wall, and under eaves of new room and octagon, and gutter.

Tue 10-04: Stucco color coat on west wall. Note decorative foam band.

Tue 10-15: Stucco fragments have fallen into the octagon gutter. Location: #12 from above.

Thu 10-27: Interior painting (upstairs) by Mario.

Thu 10-27: Dirt must be dug out 6 inches below stucco. Needs new drain, new plants.

Thu 10-27: Trench for 4 inch drain, near southeast corner of garage.

Demolition Framing Roofs Craft Work Hold-Downs Electrical Index